Menu

resource pack

AnotherBackroomsProjectMinecraft resource pack

A realistic backrooms resource pack with shaders using posteffect command.

client only
Latest version
1.01
Minecraft
no version declared
Licence
LicenseRef-All-Rights-Reserved
Downloads
12
Updated
3 mo ago
Available on
Modrinth

Download

From AnotherBackroomsProject’s own host. Nothing is re-hosted here.

Most recently published release

1.01release17 Jul 2026

AnotherBackroomsProject.zip · 8.4 MB · for 26.3-snapshot-4, 26.3-snapshot-3

Download this release
c4802b37b35f…
Older versions1
  • 1.017 Jul 202626.3-snapshot-4, 26.3-snapshot-38.4 MB1 download2a5f2ce64d92…Get

Frequently asked

Do I need to install AnotherBackroomsProject on the client or the server?

The client only. There is nothing to install on the server side. That is the author's declared design, not a guarantee for every server: one running anti-cheat or missing a counterpart mod can still object.

What licence is AnotherBackroomsProject under?

LicenseRef-All-Rights-Reserved, as stated by the author on the platform we synced it from. Check the project's own page before redistributing or bundling it.

How do I install AnotherBackroomsProject?

Download the file from the author's own release, put it in your resourcepacks folder, and enable it in Options, then Resource Packs. No loader is involved; check the pack targets your Minecraft version so textures do not fall back to defaults.

Where do I download AnotherBackroomsProject safely?

Start with the author's page on Modrinth, which is where the data here is synced from. MCReference does not host or repackage files. When available, recorded download links go to the source for that release; verify the publisher, filename and any available checksum before running it.

Which Minecraft versions does AnotherBackroomsProject work on?

The author has not declared a supported version in the metadata we sync, so there is nothing here we can state as fact. Check the project's own page before installing it, and treat an old resource pack with no declared version as untested on modern Minecraft.

Details from Modrinth, where the author last updated it on 17 Jul 2026. We do not host files or republish descriptions. Available download links point to the author’s own release.

Not indexed yet. Score 31 against a threshold of 55. The page still exists and is still linked; it simply carries noindex until we hold more.

Is this information wrong or missing something? .